Offical-Logo
Offical-Logo
Zhengzhou, Henan China
24 hours At your service

burj dubai concrete pumping

burj dubai concrete pumping

Burj Dubai Concrete Pumping - YouTube

Feb 19, 2009  We Love Concrete Pumping Come visit us at concretepumping

get priceEmail Contact

Concrete Pumps Reach Record-Breaking Heights at Burj ...

Jul 20, 2015  At the construction site of the Burj Khalifa, the world;s tallest building, concrete was pumped to a record height of 606 meters (m). A strategically designed concrete pumping system made the final conveying height a reality, as the concrete flowed through several stages up the 828-m tower. The Pump Station

get priceEmail Contact

High-rise pumping at the Burj Dubai at over 400 bar ...

concrete production and delivery at the Burj Dubai – decided to commission Putzmeister AG with the supply and installation of the pumps and boom systems. Putzmeister had already ascert-ained by pumping tests, that the concrete pumps and pipelines were suitable for delivery heights up to 570 m with a pump output of around 30 m3/h. For stat-

get priceEmail Contact

Putzmeister Pump Breaks World Record at Burj Dubai

STURTEVANT, WI (February 1, 2008) – In early November 2007, a Putzmeister BSA 14000 SHP-D pump reached a concrete conveying height world record for the Burj Dubai – an astounding 1,971 feet (601m). At the record-breaking height, a concrete wall of the central building core was placed by a Putzmeister MX 32-4 T placing boom for level 155.

get priceEmail Contact

Burj Khalifa -- Conquering the World's Tallest Building ...

May 12, 2010  May 12, 2010 Putzmeister's specially designed BSA 14000 SHP-D reached a world record vertical concrete pumping height of 1,988 feet (606m) topping out Burj Khalifa, (previously known as Burj Dubai)...

get priceEmail Contact

New heights reached in concrete pumping

Mar 03, 2010  In April 2008, a new world record height of 606 m for pumping concrete was set on the Burj Dubai Tower in Dubai. Bryan Orchard looks at the high pressure peristaltic or piston pump technology behind this level of performance and the contribution that it can make to the latest generation of high-rise building projects. Figure 1.

get priceEmail Contact

Structural Details of Burj Khalifa - Concrete Grade and ...

The superstructure of Burj Khalifa is supported over a large reinforced concrete raft. This raft is in turn supported by bored reinforced concrete piles. The raft has a thickness of 3.7m and was constructed in four separate pours. The grade of concrete raft is C50 which was self-consolidating concrete.

get priceEmail Contact

The Burj Dubai Concrete Construction Magazine

Sep 04, 2007  Standing 160 stories above ground, the final height of the Burj Dubai is still unknown. Structurally reinforced concrete and self-consolidating concrete will give this super-tall building the strength it needs to withstand wind forces and the site's corrosive soil.

get priceEmail Contact

BSA High Performance Concrete Pump - 4.imimg

reliable advances in the construction of the burj dubai (dubai tower), which (at over 800m) is one of the tallest building in the world, were secured by several powerful bsa 14000 shp d super-high-pressure pumps used in conjunction with mx 28-4 and mx 32-4 stationary booms. 165,000m3of high-strength concrete was successfully pumped to heights in

get priceEmail Contact

The Burj Dubai Concrete Construction Magazine

Feb 01, 2008  The Burj Dubai is now the tallest building in the world. It's a structural concrete building with a structural steel spire. Concrete floor work is now complete and the structural steel component is just starting. The Burj Dubai—meaning “The Tower of Dubai” in Arabic—is now the tallest building in the world and it's still rising.

get priceEmail Contact

Burj Khalifa: Conquering the World's Tallest Building ...

Burj Khalifa: Conquering the World's Tallest Building. Putzmeister's specially-designed BSA 14000 SHP-D reached a world record vertical concrete pumping height of 1.988 ft. (606M) topping out Burj Khalifa, (previously known as the Burj Dubai) the worlds's tallest building at 2,717 ft. (828M) high, in the United Arab Emirates.

get priceEmail Contact

Burj 1 - Council on Tall Buildings and Urban Habitat

Burj reaches WORLD RECORD Burj Dubai has already set a new world record for vertical concrete pumping tor a building, b} pumping to higher than 460 metres, The previous record was held by Taipei 101 for pumping concrete up to a height of 448 metres. HOME NEWS 03 for the skies Dubai's architectural marvel in the making has reached

get priceEmail Contact

Structural Details of Burj Khalifa - Concrete Grade and ...

The largest concrete pumps in the world were used to pump concrete to height up to 600 m at a single stage. Two numbers of this type of pump was used. As the temperature of the location (Dubai) is very high, there were chance of cracks due to shrinkage. So, the concrete pouring process was carried out at night at a cooler temperature.

get priceEmail Contact

Burj Dubai - Information About The Tallest Skyscraper In ...

Jan 08, 2010  The previous record for pumping concrete on any project was set during the extension of the Riva del Garda Hydroelectric Power Plant in Italy in 1994, when concrete was pumped to a height of 532 m (1,745 ft). Burj Dubai exceeded this height on 19 August 2007, and as of 8 November 2007 concrete was pumped to a delivery height of 601 m (1,972 ft).

get priceEmail Contact

The Burj Dubai Concrete Construction Magazine

Sep 04, 2007  By Concrete Construction Staff. In Arabic, the name “Burj Dubai” means “The Tower of Dubai.”. Presently the building is over 1800 feet off the ground, making it officially the tallest building in the world, surpassing the Taipei 101 building in Taipei, Taiwan, at 1667 feet. The total height of the building upon completion is still a secret.

get priceEmail Contact

BSA High Performance Concrete Pump - 4.imimg

Reliable advances in the construction of the Burj Dubai (Dubai Tower), which (at over 800m) is one of the tallest building in the world, were secured by several powerful BSA 14000 SHP D super-high-pressure pumps used in conjunction with MX 28-4 and MX 32-4 stationary booms. 165,000m3 of high-strength concrete was successfully pumped

get priceEmail Contact

Unimix sets record for concrete pumping – Unimix

“As for Unimix, this is a record-breaking feat for Putzmeister as well, as the pumping operation was successfully accomplished with the help of the super high pressure Putzmeister BSA-14000 SHPD pumps,” it said. “To date, Unimix has supplied more than 305,000 cubic metres of high-performance concrete (HPC) mixes for the Burj Dubai project.

get priceEmail Contact

Stationary concrete pumps

Burj Dubai (Dubai Tower), which at over 828 m was the tallest building in the world on completion, were secured by several power- ... A concrete pump and its accessories are subjected to a very particular kind of stress loading when required to pump concrete upwards. For example, if required to pump con- ...

get priceEmail Contact

(PDF) Concrete for high-rise buildings: Performance ...

An international case study on the Burj Khalifa (Dubai), the world's tallest building, was conducted. Findings from the case studies relating to

get priceEmail Contact

SANY TRAILER-MOUNTED CONCRETE PUMP

CONCRETE PUMP SANY TRAILER-MOUNTED CONCRETE PUMP Distributor Info. Due to our process of continuous innovation, materials and specifications are subject to ... At the construction site of Burj Dubai, reputed to be the worlds tallest skyscraper, the temperature rose to over 50°C, Even in this extreme, the Sany HBT120C-2120D operated without fail.

get priceEmail Contact

BURJ KHALIFA, WORLD™S TALLEST STRUCTURE

High-performance SCC concrete with a mix designed to provide a low-permeability and high-durability was used in the walls and columns of Burj Khalifa tower. The C80 to C60 cube strength concrete used Portland cement, fly ash, and local aggregates. The C80 concrete had a specified Young™s Modulus of 43,800 N/mm2 at 90 days.

get priceEmail Contact

A Look Through The Tallest Building in the World – The ...

yards of concrete and 31,400 metric tons of rebar–laid end to end this would extend over a quarter of the way around the world. This includes 192 piles buried more than 164 ft deep. Construction took more than 22 million man-hours. It was originally called Burj Dubai and renamed Burj Khalifa in tribute to the head

get priceEmail Contact

Burj Khalifa (Burj Dubai) - World's Tallest Building

Burj Dubai will contain the world's highest elevator installation. The amount of rebar used for the tower is 31,400 metric tons - laid end to end this would extend over a quarter of the way around the world. The Burj Dubai's water system will supply an average of about 946,000 liters (250,000 gallons) of water per day.

get priceEmail Contact

Construction of the tallest building in Dubai, the Burj ...

Nov 18, 2016  The system is able to pump the concrete mix up to the 156th floor. Even though it will take time to pump upwards to more than a hundred floors, these pumps keep the properties of concrete stable amidst changing temperatures while maintaining efficiency. b) People; The Burj Khalifa tower is expected to the tallest building in the world.

get priceEmail Contact

Burj Khalifa, Dubai (Burj Dubai or Tower of Kahlifa ...

Dubai has set a new world record for vertical concrete pumping for a building, by pumping to over 460 metres. The previous record was held by Taipei 101 for pumping concrete up to a height of 448 metres. Burj Dubai break the world

get priceEmail Contact

Sany Pump King challenges the sky's height

Burj Khalifa, also known as Burj Dubai or Dubai Tower, is the tallest building in the world. Twenty-one sets of Sany’s pumping equipment including seventeen HG32B placing booms, three HBT60C-1816D trailer pumps, and one set of SY5392 truck-mounted concrete pump were purchased by the UAE construction group Unimix for the construction of Burj ...

get priceEmail Contact

Unimix sets record for concrete pumping Property – Gulf News

May 25, 2007  A significant aspect in the Burj Dubai pumping operation is that a very low water-cement ratio, high-strength concrete mix was pumped single-stage to this new record height. Low water-cement ratio ...

get priceEmail Contact

Burj Dubai - Information About The Tallest Skyscraper In ...

Jan 08, 2010  The previous record for pumping concrete on any project was set during the extension of the Riva del Garda Hydroelectric Power Plant in Italy in 1994, when concrete was pumped to a height of 532 m (1,745 ft). Burj Dubai exceeded this height on 19 August 2007, and as of 8 November 2007 concrete was pumped to a delivery height of 601 m (1,972 ft).

get priceEmail Contact

Construction of the tallest building in Dubai, the Burj ...

Nov 18, 2016  The system is able to pump the concrete mix up to the 156th floor. Even though it will take time to pump upwards to more than a hundred floors, these pumps keep the properties of concrete stable amidst changing temperatures while maintaining efficiency. b) People; The Burj Khalifa tower is expected to the tallest building in the world.

get priceEmail Contact

Burj Dubai Construction Data

SKE100, 4 concrete placing pump reinforcement platform Contractor: Joint Venture: Samsung, Besix, Arabtec Kontakt: Kim, Ivan Bruyninckx, (Robin), Kang. Burj Dubai Amenities: Exclusive corporate suites Residential suites A cigar club Four pools Observation platform Restaurants Library Exclusive residents’ lounge 15,000 square-foot fitness area

get priceEmail Contact

Early Planning for the Concrete Work at the Burj Khalifa ...

Abstract. Soaring over Dubai skyline at 828 meter, the Burj Khalifa Tower stands tallest structure ever built by man. The tower consists of 156 floors of concrete construction that is topped out with steel floor framing systems up to level 162 and with braced construction to the top of the pinnacle. While the early integration of aerodynamic ...

get priceEmail Contact

Engineering the World’s Tallest – Burj Dubai

The Putzmeister pumps utilized on site include two of the largest in the world, capable of concrete pumping pressure up to a massive 350 bars through high pressure 150mm pipeline. Construction. The Burj Dubai utilizes the latest advancements in construction techniques and material technology. The

get priceEmail Contact

BURJ KHALIFA, WORLD™S TALLEST STRUCTURE

High-performance SCC concrete with a mix designed to provide a low-permeability and high-durability was used in the walls and columns of Burj Khalifa tower. The C80 to C60 cube strength concrete used Portland cement, fly ash, and local aggregates. The C80 concrete had a specified Young™s Modulus of 43,800 N/mm2 at 90 days.

get priceEmail Contact

Burj Khalifa - Wikipedia

The Burj Khalifa (/ ˈ b ɜːr dʒ k ə ˈ l iː f ə /; Arabic: برج خليفة, Arabic pronunciation: [bʊrd͡ʒ xaˈliːfa], Khalifa Tower), known as the Burj Dubai prior to its inauguration in 2010, is a skyscraper in Dubai, United Arab Emirates.With a total height of 829.8 m (2,722 ft) (just over half a mile) and a roof height (excluding antenna, but including a 244 m spire) of 828 m ...

get priceEmail Contact

Burj Khalifa (Burj Dubai) - World's Tallest Building

Burj Dubai will contain the world's highest elevator installation. The amount of rebar used for the tower is 31,400 metric tons - laid end to end this would extend over a quarter of the way around the world. The Burj Dubai's water system will supply an average of about 946,000 liters (250,000 gallons) of water per day.

get priceEmail Contact

How was the Burj Khalifa in Dubai built? – Curiosities ...

Dec 28, 2021  Construction of the Burj Khalifa. In January 2004 excavation began to build the Tower in what would become downtown Dubai. One of the most recognized areas of the city where there is also the largest shopping center in the world, the Dubai mall. Aerial view of the luxurious Dubai mall. Its construction time was also outstanding.

get priceEmail Contact

Burj khalifa - SlideShare

May 16, 2015  3.3 Construction Equipment Construction Equipment : Cranes Tower Hoist Concrete Pumping Cranes Site Logistic Plan The Burj Dubai site area is approximately 105,600m2 and encompassing the tower, the office annex, the pool annex, and the parking areas, divided into three zones (Zone A, Zone B, and Zone C).

get priceEmail Contact

High Rise Construction - ACD Deep Foundation Concrete

Burj Khalifa. Concept, Design Construction-Ar.Clarance CONTENTS. INTRODUCTION STRUCTURAL ANALYSIS WIND EFFECT SOIL INVESTIGATION FOUNDATION PLANNING OF CONCRETE WORK CLADDING AND LIFTS Introduction Burj Khalifa (formally Dubai) is the new tallest tower in the world. Construction began on 21 September 2004 completed on 1

get priceEmail Contact